A blizzard, an ice storm, or just a record snowfall disrupt workflow. No matter which shipment should be leaving a plant, which delivery is expected, or which customer is waiting for a cleaning team to arrive, the priority for any business switches to safety. And safety begins with waiting for good visibility, ice removal, or just digging out.
Even without a significant weather event, manufacturers, distributors, and contractors must adjust their workflow in cooler weather to be certain what they are making and selling—including services—matches the needs of their customer base.
“Generally we see a modification in sales volume per market(s)” in cooler weather, says Dennis Black, president of McHenry Pressure Cleaning Systems Inc. in Frederick, MD. The modification does not necessarily mean scaling back sales expectations.
“Certain business types generate more sales than others in winter,” explains Black. “In our area most outside property maintenance cleaning stops when temperatures go below freezing.”
The stop affects the property management and contract cleaner markets that Black serves. “Sales of gas engine equipment can be affected to some extent, and generally sales in these markets are less,” he explains.
At the same time, new needs arise because of cooler weather. “Since we have snow and inclement weather, municipality fleets, trucking fleets, and companies that push snow must wash to remove salt, usually after every event,” says Black.
“So, what we call ‘inside cleaning’ will increase depending on temperatures and flow of weather,” explains Black. “Our best scenario for business is small snowstorms followed by days with temperatures above freezing and the repeating of that cycle.”
Persistent subfreezing temperatures can create challenges, though. “Temperatures below 20 degrees Fahrenheit for extended periods with no snow have the worst effect on business,” says Black.
Still, there is a bit of a positive. “These cold temperatures do help the sales of portable heaters, which are a diversification item for us,” explains Black, who adds the sales volume for the heaters can be tied directly to the low temperatures.
Black says that if there is a slowdown in activity, there are productive ways to fill the time. “Some business is generated by building custom rigs for customers preparing for the next spring cleaning season,” says Black.
There are changes that any business can make to align more perfectly with workflow that slows. It’s all about thinking through the possibilities and implementing ideas that work.
For example, since sales of gas engine equipment and accessories decrease in cooler weather, Black says his company attempts to adjust inventory accordingly.
Similarly, sales of accessories like undercarriage cleaner systems and attachments increase, so inventory must follow, explains Black. Then, there’s the opportunity for adding to the service center sales.
“Service work can increase due to damage caused by freezing temperatures,” says Black. “All equipment repaired and/or serviced in our shop must be properly winterized and protected before leaving.”
Volume of sales for chemicals follows a seasonal pattern, and adapting to it means the company is ready to meet the needs of buyers. “Sales of certain chemicals such as salt neutralizer products increase and are not sold as much in other times of the year,” says Black.
“Generally, business is a little harder to conduct in cooler weather,” says Black. “Equipment starts harder and items freeze and break easier. Let’s face it, working on something that uses and sprays water is tough when temperatures go below freezing.”
The average low temperature in January and February in Rapid City, SD, is 17°F. In December the average low is 18°F. And a daytime temperature that reaches 40°F in any one of the three months is not the norm.
Yet it’s not just the sustained cold temperatures that pose a challenge. “Temperatures that are too hot or too cool can affect productivity, as in our region,” says Terry Lee Bosma, president of Pressure Services Inc. in Rapid City, SD.
“We see temperature swings that are drastic,” says Bosma. “Spearfish, SD, located 44 miles from our facility, had a record temperature swing on January 22, 1943.”
How drastic? “It featured a 49-degree rise in two minutes and a 58-degree drop in 27 minutes,” says Bosma. “So, the answer is to be prepared for all conditions.”
That preparation includes not only adjusting to the workflow generated by customers but also acknowledging the way cooler, or even frigid, conditions affect employees. “Efficiency changes based on how comfortable versus uncomfortable any person is,” says Bosma.
“Inside our facility I have air conditioning with overhead fans in my first two-story warehouse bay, which houses two levels of chemical storage, two levels of parts, a main level shipping area, and a main level photo area; and the second two-story warehouse bay houses the workstations, shop equipment, and service office for our technicians,” explains Bosma.
“We have a third warehouse bay which houses two levels of chemical storage, but because of the limited time spent in that warehouse, we just utilize an overhead fan,” says Bosma. “In addition to our front offices, all warehouse bays have heat that is individually controlled, and additional offices within warehouse bays have heat controlled separately from the warehouse they are in.”
The preparation for temperature includes auxiliary support. “We also have floor fans if needed,” says Bosma.
Smooth workflow depends upon employees who can meet the elements safely. “For outside work we furnish caps, winter covers, short-sleeve and long-sleeve shirts, lightweight jackets, insulated Carhartt coats, and coveralls,” explains Bosma. “In addition, we have LP [liquid propane] and kerosene fired portable heaters.”
Bosma holds a clear-eyed view about what the vagaries of weather mean. “Our staff works many times in dirty, harsh, hot, humid, cool, and extreme cold environments,” he says. “We can’t control the weather, but we can control to an extent how it impacts productivity and morale.
“Whenever possible on extreme hot or cold days we try to keep technicians doing in-shop work, continues Bosma. “If they are installing equipment in extreme heat, we encourage them to purchase water, Gatorade, or take one of the company drink coolers on site and fill it with ice and water or Gatorade and place the expense on their company credit card.”
The credit card policy for ensuring employees are properly hydrated works well. “We have never had any staff abuse this privilege, and preventing our staff getting sick from cold or hot conditions is far less expensive than a trip to the Urgent Care,” says Bosma.
Leave discontent in winter to Shakespeare. Members of our industry refresh, renew, and refine.
“Unlike contractors whose businesses may be impacted by seasonal weather, HydraMotion Cleaning Systems experiences less of a slowdown because we manufacture products that are distributed nationwide,” says Bruce Tassone, president of the company headquartered in Pottstown, PA.
“While colder temperatures may reduce activity in one region, work continues elsewhere in the country, allowing us to support distributors and service customers year-round,” explains Tassone. “In many ways, there’s always work being done somewhere.”
Yet seasons do change in the Commonwealth of Pennsylvania and even in places like the Sunshine State. If that means there’s a bit of extra time, it should be used wisely.
“Seasonal shifts give us a chance to focus on the future,” explains Tassone. “During the slower winter period, our engineering team devotes more time to research, product testing, and continuous product improvements.”
Filling a seasonal (cooler weather) ebb in workflow with efforts trained on continuous improvement is important, explains Tassone. “This lets us introduce refinements that improve product performance, reliability, and ease of maintenance before the next busy season.”
Of course, it’s not just the products themselves that get attention. Processes in manufacturing can always be improved even slightly to gain a competitive edge.
“One of the biggest changes we make during cooler weather is shifting more focus toward engineering projects and internal business improvements,” says Tassone. “Our engineering team tests new product enhancements, refines manufacturing processes, and develops new cleaning chemistries and equipment. At the same time, our administrative group upgrades accounting packages, evaluates new vendors, and improves databases to strengthen tools that drive our sales and marketing efforts.”
The effort to extract every bit of improvement possible from all facets of a business is a prudent way—but not a unique way—to take advantage of the time afforded by a slower pace of work. Tassone explains that what’s going on at his company is mirrored across the company’s customer base.
“Many of our customers focus on equipment maintenance, make year-end equipment and product purchases as part of their tax planning, and stock replacement parts in preparation for the spring season,” says Tassone. There’s significant opportunity in that knowledge.
“We support those customer efforts by maintaining inventory, providing technical assistance, and ensuring replacement parts are readily available through our national distributor network,” explains Tassone. “By the time spring arrives, we have not only met our customers’ needs throughout the winter but also introduced improvements that make their businesses more productive and profitable.”